So I have been asked by a couple of people to custom Paint a few cars. Here are my Prices
All prices are per Piece
Single Color with basic decals $50 per plus cost of decals and Paint
Each additional color $25 plus paint
Stripes $25 plus decals.
Steam Engine is considered 2 pieces
UP loco would be $100 plus decals and Paint. 2 colors plus stripes.
If I already have the Paint and/or the decals the charges will be less.
I prefer to only paint N scale
Here are some the Pieces that I have done for my self, See Conrail dd40ax from a previous post.
Custom built crew car (2 others in process) 2 UPFE repaints, (20 more to go)
3 more Upfe Repaints
Custom Built Bulkhead with wood sides, Patched gondola (30+ more UP MOW cars painted) Tie Picker custom painted
Former Sleeper car with windows welded over and Painted, ( 1of 3) Missouri Pacific Caboose (1 of 2)
2 Montana RailLink SD40's
2 GP30's in need of decals, for a yet to be determined road.
Email Me if you are interested in any painting.
Saturday, November 17, 2012
Monday, November 7, 2011
Thursday, October 20, 2011
Misc.
First of all a Thank you to the Guys at RED CABOOSE. They honored a coupon for a free car that was issued 15 years ago by a company that they bought out, and even more than that they sent 2 cars instead of one. Thank you agian.
Also I am in the process of painting and decaling a DD40XA in Conrail, (not mine it is for some one else.)
Also all the track has been torn up and I am researching the cost, value, usablaity, and durability of base and roadbed for the layout..... More to come on final outcome.
Also I am in the process of painting and decaling a DD40XA in Conrail, (not mine it is for some one else.)
Also all the track has been torn up and I am researching the cost, value, usablaity, and durability of base and roadbed for the layout..... More to come on final outcome.
Wednesday, June 15, 2011
New Passenger Station
Sunday, May 29, 2011
Cabeese of the WYB of the OSL
I like cabeese (cabeese is the plural of caboose, right, goose-geese anyway.) Most of the cabeese I have are of the shelf models with modifications, or planed modifications. Here are my cabeese.
These cabeese are from Centralia and distributed my Intermountain. From left to right. The first one is stock out of the box from the 2010 release, color is a little yellower and it has plastic wheels, it need it roof walks and ladders removed. The next one is from 2004 release it is heavier and has metal wheel sets, it need the same treatment of removal of roof walks, 3rd same as the first. 4th same at the first, but I have removed the roof walks it still needs to have paint touched up, it took me all of 5 minutes to remove the rook walks and ladders. The one on the end is from the 2004 release. This is the first one I bought and when I started to take the rook walks and ladders off I disassembled a whole lot more than I needed and it sat in a box for 3 years before I got up the nerve to try again to reassemble. The roof looks weathered and faded because my touch up paint doesn't match, I think it looks great and the other 4 will soon match this one.
More Centralia cabeese, the one on the left is the floor model, can you tell. I added some steps where they broke off, renumbered and added the safety slogan, at the time I also removed the roof walks and ladders, and rebuilt a coupler mounting area. Again it looks weathered and worn because my touch up paint doesn't quite match. I am really starting to like the look of paint that doesn't match. The other two are stock and will someday get the roof walk and ladder treatment.

2 WP cabeese, the one the left is from Walthers, and i have added extra decals, the one on the right is the new Micro-Trains release, yeah I know it looks way to tall, even sitting by itself it looks tall, it is the same for all of their bay window cabeese, ( I have the SP and CNW, they all look to tall)

Three identical cabbeese from Walthers, well they were, can you find the original one, I will give you a hint it is broken. I renumbered and added different slogans to the other two.

The finally 2 are Atlas wide vision MP cabeese custom painted and decaled, one still needs a little white paint.
All in all they all look good and to scale with the exception of the MTL caboose. Coming soon to an end of train near Eastern Idaho.
Wednesday, May 11, 2011
History of the West Yellowstone Branch of the Oregon Shortline
I have been thinking lately about redoing the first level of my layout and creating a second level and in that thinking I have writen a breif Fictional history of my railroad. It will probably change over time but here it is.
Fictional History of the West Yellowstone Branch of the Oregon Shortline. (Union Pacific) 1970-1994
West Yellowstone Lumber was started in 1970
Railroad called West Yellowstone Lumber Railway.
Purchased 2 gp9 from Union Pacific.
Purchased track from Union Pacific from Ashton to West Yellowstone Spring 1971.
Union Pacific maintained trackage rights to West Yellowstone.
Fall 1974 started negotiations with Union Pacific to Build a Passenger station in Idaho Falls north of Hemmet ave.
Spring 1975 Broke ground on Depot south of Hemmet ave.
Summer 1975 Purchased 2 E9A used from Union Pacific.
Summer 1975 Purchased 3 coach cars used from union pacific.
Spring 1976 West Yellowstone Lumber Railway becomes West Yellowstone Scenic Railway.
1980 Small depot built in Island Park.
Dec 1981 West Yellowstone Station burs to the ground do to old wiring.
1982 Temporary Depot used in West Yellowstone
1982 depot built in Rexburg.
1984 depot built in Ashton.
1984 purchased 3 dome cars from Autotrain breakup, repainted in Full Union Pacific Paint.
1986 Station Completed in West Yellowstone complete loading ramp for vehicles.
1986 Depot built in Rigby with loading dock for loading vehicles on to flat cars.
1986 purchased 3 flat cars to be used in service in conjunction with passenger train to haul vehicles and atvs from new station in Rigby to West Yellowstone.
1987 loading ramp added in Island Park for vehicles and Atv due to popular demand.
1990 Passenger division and stations of the West Yellowstone Scenic Railway Sold to Local Investor Lee Calkins for an undisclosed amount. New owner negotiated a lease and trackage rights with Union Pacific and West Yellowstone Lumber Co. for 99 years.
1990 West Yellowstone Lumber Railway is once again created and owned by West Yellowstone Lumber Co.
Union Pacific sold Ashton Branch, East and West Belts to EIRR on November 21, 1993
Spring 1994 West Yellowstone Lumber Railway began lease of 2 gp30 from National Railway Equipment Company (NREX)
Current era summer 1994
Operations today
Union Pacific brings in trains to Idaho Falls.
EIRR switches Ashton branch, East and West Belts. Mon-Friday.
EIRR transfer cars to West Yellowstone, Mon and Thursday.
Passenger train Leaves Idaho Falls Station at 8:00 am daily Memorial Day Weekend through Labor Day Weekend.
Rigby 8:20-8:40
Rexburg 9:10-9:20
Ashton 10:20-10:30
Island Park 11:20-11:40
West Yellowstone 12:30
Return Trip Departs at 2:00pm with a similar schedule.
WYSRR Leases space from EIRR to store passenger train over night in Idaho Falls Yard.
WYSRR Geeps only leave West Yellowstone with Maintenance Of Way train in spring and fall, to prepare the line for summer and winter. Line is Inactive from the first snow till it melts in the spring. Rotary snow plow and locomotives are leased from Union Pacific for the Last week of April every year to reopen line.
End History
Let me know what you think. I am still working on revamped track plan.
Fictional History of the West Yellowstone Branch of the Oregon Shortline. (Union Pacific) 1970-1994
West Yellowstone Lumber was started in 1970
Railroad called West Yellowstone Lumber Railway.
Purchased 2 gp9 from Union Pacific.
Purchased track from Union Pacific from Ashton to West Yellowstone Spring 1971.
Union Pacific maintained trackage rights to West Yellowstone.
Fall 1974 started negotiations with Union Pacific to Build a Passenger station in Idaho Falls north of Hemmet ave.
Spring 1975 Broke ground on Depot south of Hemmet ave.
Summer 1975 Purchased 2 E9A used from Union Pacific.
Summer 1975 Purchased 3 coach cars used from union pacific.
Spring 1976 West Yellowstone Lumber Railway becomes West Yellowstone Scenic Railway.
1980 Small depot built in Island Park.
Dec 1981 West Yellowstone Station burs to the ground do to old wiring.
1982 Temporary Depot used in West Yellowstone
1982 depot built in Rexburg.
1984 depot built in Ashton.
1984 purchased 3 dome cars from Autotrain breakup, repainted in Full Union Pacific Paint.
1986 Station Completed in West Yellowstone complete loading ramp for vehicles.
1986 Depot built in Rigby with loading dock for loading vehicles on to flat cars.
1986 purchased 3 flat cars to be used in service in conjunction with passenger train to haul vehicles and atvs from new station in Rigby to West Yellowstone.
1987 loading ramp added in Island Park for vehicles and Atv due to popular demand.
1990 Passenger division and stations of the West Yellowstone Scenic Railway Sold to Local Investor Lee Calkins for an undisclosed amount. New owner negotiated a lease and trackage rights with Union Pacific and West Yellowstone Lumber Co. for 99 years.
1990 West Yellowstone Lumber Railway is once again created and owned by West Yellowstone Lumber Co.
Union Pacific sold Ashton Branch, East and West Belts to EIRR on November 21, 1993
Spring 1994 West Yellowstone Lumber Railway began lease of 2 gp30 from National Railway Equipment Company (NREX)
Current era summer 1994
Operations today
Union Pacific brings in trains to Idaho Falls.
EIRR switches Ashton branch, East and West Belts. Mon-Friday.
EIRR transfer cars to West Yellowstone, Mon and Thursday.
Passenger train Leaves Idaho Falls Station at 8:00 am daily Memorial Day Weekend through Labor Day Weekend.
Rigby 8:20-8:40
Rexburg 9:10-9:20
Ashton 10:20-10:30
Island Park 11:20-11:40
West Yellowstone 12:30
Return Trip Departs at 2:00pm with a similar schedule.
WYSRR Leases space from EIRR to store passenger train over night in Idaho Falls Yard.
WYSRR Geeps only leave West Yellowstone with Maintenance Of Way train in spring and fall, to prepare the line for summer and winter. Line is Inactive from the first snow till it melts in the spring. Rotary snow plow and locomotives are leased from Union Pacific for the Last week of April every year to reopen line.
End History
Let me know what you think. I am still working on revamped track plan.
Subscribe to:
Posts (Atom)











